EV charger install — Zappi 7kW Invoiced
JOB-1002 · Cathal Murphy · created 16 May 2026
Details
- Site address
- 3 Vernon Grove, Raheny, Dublin 5
- Job type
- EV charger install
- Scheduled
- 24 May 2026 08:00 — Dara Nolan
- Contact
- 086 777 8899
- Scope / notes
- Supply and install Zappi 7kW on driveway wall, ~9m cable run from board. SEAI grant paperwork provided.
Quote
AcceptedQ-2002 · issued 18 May 2026 · 3 line items
€1,447.13 inc VAT
Invoices
| INV-3002full | Overdue | due 9 Jun 2026 | €1,447.13 | €1,447.13 due |
Activity & notes
- CallRang Cathal re invoice — says he'll sort it this week.8 days ago
Job profitability
- Invoiced (ex VAT)
- €1,275.00
- Materials cost
- −€850.00
- Labour cost (6h logged)
- −€192.00
- Profit
- €233.0018%
Assigned to
Changes who this job belongs to without touching the schedule. Manage team
Reschedule
Materials used
- Zappi 7kW tethered1 × €720.00 · Erne Electrical€720.00
- 6mm SWA cable 10m + glands1 × €84.00 · Chadwicks Coolock€84.00
- Type A RCBO + henley block1 × €46.00 · Erne Electrical€46.00
Time logged
- Dara Nolan — 6h24 May 2026 · Install + commissioning